FOB Price
Get Latest Price1200 ~ 1500 / Ton
|50 Piece Minimum Order
Country:
China
Model No:
-
FOB Price:
1200 ~ 1500 / Ton Get Latest Price
Place of Origin:
-
Price for Minimum Order:
1200 per Ton
Minimum Order Quantity:
50 Piece
Packaging Detail:
wooden case , pallet , bundle
Delivery Time:
30 to 40 days
Supplying Ability:
10 Piece per Month
Payment Type:
D/P, D/A, L/C, T/T
Product Group :
Contact Person Ms. Judy
No. 223 Gongnong Road, Dadong District, Shenyang, Liaoning
1. Material :
ZG05Cr13Ni4Mo
2. weight : 2857Kg
3. smelting : medium
frequency furnace
4. Heat treatment:solid
solution
4. tolerance : CT 13
5. surface roughness : Ra50
6. certification : ISO9001
7. production capacity : 15/month
The
basic raw material is sand casting sand mold manufacture and sand
binder.
The most commonly used foundry sand is silica sand.
Silica sand cannot satisfy the requirement of high
temperature performance, the use of zircon sand and chromite sand,
corundum sand and other special sand. Made for the sand mould and
core has a certain strength, when handling, type and pouring liquid
metal, without deformation or damage to the general to add sand
binder in foundry, will become a sand loose sand bonded together.
Is the most widely used sand binder clay, also can be used in a
variety of drying oil or semidrying oil, water soluble silicate and
phosphate and a variety of synthetic resin as a sand binder.
Used
in sand casting sand mold by sand binder used in the outside of the
green sand mold and build strength in different ways
into clay,
dry clay sand mould and chemical hardening sand mold.Clay
bonded sand for casting, molding materials production is the
process method has a long history, is also the most widely
application scope. With a long history dating back to thousands of
years ago; Its application scope, can be said that there is no
place not all over the world.
Country: | China |
Model No: | - |
FOB Price: | 1200 ~ 1500 / Ton Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 1200 per Ton |
Minimum Order Quantity: | 50 Piece |
Packaging Detail: | wooden case , pallet , bundle |
Delivery Time: | 30 to 40 days |
Supplying Ability: | 10 Piece per Month |
Payment Type: | D/P, D/A, L/C, T/T |
Product Group : | Casting parts |