FOB Price
Get Latest Price1000 ~ 2000 / Ton ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
50 Piece
Packaging Detail:
Wooden case, wooden pallet or as per customers' requirements
Delivery Time:
15-20 days after orderANSI A105 Carbon steel flang
Supplying Ability:
1000 Piece per Month
Payment Type:
T/T, L/C
ANSI A**5 Carbon steel flange
A Slip-On Flange is bored sightly larger than the outer Diameter of the matching pipe.
The pipe slip into the flange prior to welding both inside and outside to prevent leaks.
The British standard flanges manufactured by us pertain to all standards like BS*0 ***2 Table D,E,F,H IS ***2 Table 5,*7,*6 IS ***8 in slip.
These are manufactured using mild steel both in slip on and blind type.
Detailed Product Description of Slip-On Flange :
The slip on flange has a low hub because the pipe slips into the flange prior to welding.
It iswelded both inside and out to provide sufficient strength and prevent leakage.